Ecospan Construction specializes in providing advanced Post-Tensioning (PT) solutions for construction projects.

 

PT is a globally recognized technology known for its efficiency across a wide range of structures, including: residential and commercial buildings, high-rises, car parks, airports, hospitals, hotels, malls, silos, girder and transfer beams, ground anchors, soil nailing, micro piling, and bridges.

 

How Post-Tensioning Works

With a long and proven history worldwide, the PT system operates on a balanced loading concept. The post-tensioning elements are designed to counteract the building's collective loads (live, dead, and superimposed).

 

PT strands, composed of seven high-tensile wires, are tensioned using hydraulic equipment. This applied force provides high structural stability while achieving an ultimate reduction in the amount of concrete and standard steel reinforcement required.

The benefits of Post-Tensioning extend far beyond simply saving concrete and steel. This advanced system also provides:

 

Structural Quality: High structural stability, control of cracking, and better deflection management.

 

Time & Efficiency: Rapid construction, less formwork, and early form striking.

 

Cost & Logistics: Less manpower required, simplified reinforcement detailing, and reduced risk in materials shifting and handling.

What We Do

Why To Choose Ecospan

Ecospan provides a wide range of professional, specialized services, including: Supply of Post-tensioning components, designing, detailing, installation, stressing and grouting works.

As a specialist in post-tensioning works, we ensure that our entire operations are professionally monitored and executed by our expert team.

Ecospan supply certified post-tensioning components, anchor, anchor block, GI duct, epoxy coated chairs, wedges, grouting tube, stressing jack, grouting pump.

The designing of structures are manged by experienced specialized design engineers and the detailing are simple and helps contractor to complete the work faster.

The post-tensioning components are approved and certified by PT experts and international laboratories. All materials are ISO certified, tested by Australian lab, approved by ministry of work Bahrain, Dubai central laboratory approved, PTI USA and Australia certified. We have German designed and tested post-tensioning systems.

The complete installation works are monitored and supervised by professional managers, engineers and supervisors.

Complete post-tensioning works are monitored and inspected by professional engineer. We have quality control system and checklist for each stage of post-tensioning activities.

Ecospan provides stressing and grouting works as free of charge and the throughout the work managed by the professional engineers.

Successfully completed 1000+ projects with out any issues. Most of the customers are fully satisfied with our service and support.

Our best design support provides maximum cost & time saving for the contractor and client.

Simple Steps To Get Post-Tensioning Service

Consultant engineers widely recognize the value of our Post-Tensioning works. Please contact us via email or landline number, and we'll be happy to explain our streamlined procedures.

  • What is the Procedure to get the quotation?

    To discuss your project and any related queries, please contact us directly at our landline number.

     

    For a quotation, please email or share your PDF or CAD drawings with us. We estimate the quotation preparation will take 1 to 2 working days.

  • What are the Informations available in quotation?

    Our quotation provides a complete analysis that includes the final design and detailed material classification. For easy estimation, we break down the total cost using the post-tensioning slab area, providing unit rates by sqm or ton. Furthermore, we supply precise quantities for all associated materials, including PT work materials, steel, concrete, and formwork. This comprehensive information enables the contractor and client to accurately estimate the savings achieved through the alternative post-tensioning proposal compared to the original design.

  • What is the procedure to confirm the Post-tensioning work?

    To move forward with the post-tensioning work, please contact our Sales or Design team to confirm your interest.

     

    We will then prepare a contract agreement outlining mutually accepted payment terms for signing.

     

    Our design timelines are as follows:

     

    Regular Structures: 3 to 4 working days

     

    Moderate Projects: 5 to 7 working days

     

    Large Volume Projects: 10 working days

  • What is the procedure for Approval process?

    Our Design Team provides complete technical support throughout your project:

     

    We manage the entire approval process, including submission of drawings to the consultant and obtaining final sign-off.

     

    We support the site team by providing hard copy drawings and delivering technical clarification during execution.

     

    We coordinate every stage of activity with the site team, arranging installation, stressing, and grouting as requested to keep the project on track.

CALL US NOW

 

Office: +973 1740 3535

Mobile: +973 3369 3377

COME VISIT US

 

Office 11, Building 883, Area 215,

Road 1523, Muharraq, Kingdom of Bahrain.

SEND US MESSAGE

 

General: info@ecospan.com

Sales: sales@ecospan.com

Downloads

Our Services

Subscribe

Ecospan is innovative Post-tensioning and General Contracting Company.

 

Our primary business goal is to maximize support and savings for every customer.

Post-Tensioning

Structural Designing & Detailing

General Contracting

Subscribe and Stay with us for the latest update and offers

Value Engineering

Project Management

Submitting Form...

The server encountered an error.

Form received.

Inspection

Get latest updates and offers.

© 2025 Ecospan Construction - All Rights Reserved